When the plans were laid out for this ramping up of U.S. green manufacturing, it doesn’t appear anyone considered that the U.S. grid would need a much larger supply of electricity. Where all that power would come from wasn’t factored into the plans. As a result, projects are already having trouble finding enough power, and the green economy has just gotten underway.